
The Project generally consists of sitework for and placement of a prefabricated pedestrian bridge and abutments, including but not limited to:
- Site preparation and construction of bridge abutments
- Fabrication of custom Pinhoti Trail signage and installation onto bridge
- Coordinate delivery of pedestrian bridge
- Traffic management along US Hwy 78 during bridge placement
- Install and secure bridge to abutments
DRAFT Documents and Drawings (for reference only, to be revised)
