• Skip to primary navigation
  • Skip to main content
Alabama Trails Foundation

Alabama Trails Foundation

The location for all things trails in Alabama

  • Home
  • About
  • Board
  • Team
  • News & Updates
  • Contact
  • Give
  • Doing Business
  • Show Search
Hide Search

U.S. 78 Bridge/Pinhoti Trail Improvement Project

The Project generally consists of sitework for and placement of a prefabricated pedestrian bridge and abutments, including but not limited to:

  • Site preparation and construction of bridge abutments
  • Fabrication of custom Pinhoti Trail signage and installation onto bridge
  • Coordinate delivery of pedestrian bridge
  • Traffic management along US Hwy 78 during bridge placement
  • Install and secure bridge to abutments

DEADLINE EXTENDED: Monday, August 17, 2026 at 5 p.m. CDT

Pre-application packet (download)

DRAFT Documents and Drawings (for reference only, to be revised)

DRAFT 90% Construction Documents
DRAFT Bridge Shop Drawings
Highway 78 Prequalified
First
Last

Maximum file size: 45MB

Footer

Copyright © 2026 ยท Log in

Keep In Touch

  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
Loading Comments...